Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12689537

- Product Categories
- Friendly Links
Information Name: | Learn how to run the diesel generator set |
Published: | 2014-02-07 |
Validity: | 30 |
Specifications: | Diesel generator set |
Quantity: | 300.00 |
Price Description: | |
Detailed Product Description: | Objective: To regulate turbine operation and management work to ensure the good functioning of diesel generators. The method and process control technicians patrol monitoring generator to run generators to respond once every hour patrol. Include: diesel generators, cooling water storage boxes, exhaust and return air systems, control cabinet (box), storage tanks, batteries, silencer systems. There is no monitoring visits as follows abnormal sound or vibration. There are no unusual odor. Smoke color is normal, if there is leakage (oil, diesel), signs of leakage. Oil pressure, coolant temperature, oil temperature is normal. The frequency deviation is large, the voltage is normal, there is no current overload. Indicating whether the signal is normal. Check battery status (temperature should not exceed 45 ℃, semiconductor wetness meter). Return air is smooth. Are there signs of loosening fasteners; diesel tank oil level; consumer audio experience is ideal. For inspections not normally found in the generator technician timely adoption of measures should be addressed. "Speed" Disposal Disposal of diesel generator diesel generator exceptions: If the "Speed", generator technicians need calm, cool, quickly and decisively adopted measures. Cut off the oil: the throttle position switch is pulled down, if not yet shut down, detachable pump inlet tubing or loss of pressure tubing. Cut up the ghost road: wrap with cotton air filter and other items directly, or Remove the air cleaner, cotton and other items plugged directly into the air intake (when cut ghost road, Volvo diesel generator sets must pay attention to safety). Reduction or loss of the absolute prohibition to load. After engine shutdown, immediately find the cause. After troubleshooting test run, you can use the normal rear. If the diesel generator suddenly stopped during operation, immediately rushed to the generator room, press the emergency stop button and notify supervisors and other professionals, jointly analyze causes of downtime, After troubleshooting, before starting the generator again. The following reasons may lead generator shutdown: low oil pressure; temperature is too high; speeding coaster; overload operation; emergency stop button action and so on. Diesel generator room fire incidents by "firefighting operating instructions" for disposal. Disposal of diesel generator room flooded when found. Depending on water flows off into the loss of room to run diesel generators. Shut off the water. If leakage is large, immediately notify the engineering department, while trying to stop the water. Source block leakage immediately after drainage. After draining the water, immediately wet initiative measures dehumidification equipment. Confirm wet water has been removed, the insulation resistance of each normal boot test run, normally put into use. Mediation generator technician should open automatically stop and the time period control, "electricity" blackout powered generator should start and within one minute, "electricity" come in after 15 minutes when no-load operation is stopped. For manual operation of the diesel generators when the "mains" power should be started within 15 minutes and start the diesel generator power; "when mains & r calls, diesel generator should be shut down within 20 minutes of each load. test run 8 to 15 minutes, once every two weeks trial run; every quarter run with a load (such as pumps, fire pumps and other loads), less than 20 minutes running time technician should change according to its load properly mediate its throttle size. equipment to deal with the unit responsible for the operation of the data analysis, in order to keep abreast of the generator status, found hidden. generator fuel tank should reserve 24 hours of full load fuel consumption diesel generator room management of non-staff not quasi-entered the room, To walk through engineering department and have someone accompany favor. smoking is prohibited inside the engine room and storage of flammable, explosive, or other dangerous goods, get ready fire equipment in a conspicuous place. cleaned once a week room Health and link neat. room should be properly ventilated, well-lit, doors and windows open and flexible. room must be locked and the keys kept by the generator technician, any person shall privately with the key. generator technician should regulate the operation of diesel generators, detailed, clearly documented in the "diesel generator running record sheet" and archived, saved for three years. 100KW generator http://www.shtgfdj.com/power/100kw.html 150KW generator http://www.shtgfdj. com/power/150kw.html 200KW generator http://www.shtgfdj.com/power/200kw.html 50KW generator http://www.shtgfdj.com/power/50kw.html Stamford http:// www.shtgfdj.com/news-3/77.html |
Admin>>>
You are the 10600 visitor
Copyright © GuangDong ICP No. 10089450, Complete Engine Co., Ltd. Shanghai Tai Kok All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10600 visitor
Copyright © GuangDong ICP No. 10089450, Complete Engine Co., Ltd. Shanghai Tai Kok All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility